Related Posts
Larsen & Toubro Infotech I have given the L1 on 7th May and that was cleared and L2 given on 14th May.
Got the mail from recruiter that cleared 2nd round and will get update soon for further process.
So in how many days I can expect for HR round and further process ?
Or they can ghost me ? Can it happen in Larsen & Toubro Infotech that after clearing both rounds they won't go forward for further process ?
Thanks
Is anyone planning on trading water futures?
I hate going to the Apple Store nowadays.
Can I get 11 likes to DM. Thanks 🙏🏽
Additional Posts in Architecture, Engineering, and Construction
New to Fishbowl?
unlock all discussions on Fishbowl.



Just about, if the wall was structural you may need to install a beam or lintel above the door to share the load, but the door can be installed all the same. If you’re unsure if the wall is load bearing or a partition, I would consult a structural engineer or a skilled general contractor, before demoing anything.
Please be careful if this is a shear wall
It would still be possible?
Some walls can, some can't.
Hire a licensed professional engineer who designs structures to perform an analysis and confirm in a sealed report that it is possible for the specific situation you are concerned with.
This is the content I need more of on bowl