Related Posts
Hi Guys,
I have been assigned to a Unbillable Project, they are building one app and have recruited people from the talent pool. The project is not registered in GLOW. And they are calling it as Voluntary Contribution type project for studio. Is this what they call Internal Project in Globant?
Will there be any impact if I don't perform as per their expectations?
Will it be of any benefit to me if work in voluntary project? Will HR recognize this project contribution as valid work?
Globant
How is the project for 'Tyson' client?
More Posts
Reasons not to join HCL ??
Hello Everyone,
Last Monday i.e on 10th Oct, I received a mail from Infosys to submit documents such as Infy Application form, Latest offer/Revision Letter and ID Proof. Its been a week and I have not received any response from them. Can anyone please let me know how much time will they take to get back. 2nd Tech round was cleared on 3rd Oct.
Has anyone heard anything from the Amtrak RFP?
Not rocket science

Additional Posts in Woodworking
New to Fishbowl?
unlock all discussions on Fishbowl.














Coming along well with some drawer slides. I hope everyone is making progress with their side projects!
Could this be put on casters? I'm looking for work table patterns and I think mobility is going to be useful in my garage
Yep, casters and leveling feet are in the mail and will get here on Wednesday. Should look like this when I’m done:
Just saw your post, P1: yep, t track is going in as well, but I’m waiting until next month to do that. Right now I just REALLY NEED an out-feed and assembly table for a bathroom remodel that my wife is starting in two weeks.
Insanity well done man
Slowly but surely. Drawers went in this weekend. Need to face them, then finish the top of the work surface.
I’m using this guy’s plans, and highly recommend them. He does a great job laying out the plywood cut diagrams, and his companion video really helps.
https://www.google.com/amp/s/craftedworkshop.com/blog/ultimate-t-track-assembly-outfeed-table-with-systainer-storage-how-to-build-woodworking%3fformat=amp
All done!